Four pictures above clockwise, had floor built and ramp leading to existing deck after making an entrance to the deck, next is walls and roof of hot-tub enclosure, pic 3 shows close up of screened and covered walkway leading to deck, last, hot-tub wired, filled, privacy wall on one side, a wall length bar and bar stools, also repaired main deck and re-screened.